How to Prepare for a Kitchen Remodeling Project

104 17
    • 1). Meet with your contractor to go over the finalized remodeling plans and confirm the details of the project. During this meeting, address potential issues with the contractor, such as where the construction vehicles should be parked, where the contractors can use the bathroom if necessary, and the entrances that the worker's should use. Going over these details in advance will help prevent misunderstandings during the project.

    • 2). Remove all items from the kitchen cabinets, drawers and shelves. Store the items you will not need for the duration of the remodel in boxes or plastic bins, and put the containers in an out-of-the-way location, such as a spare room or a garage, where they will not be damaged during the construction.

    • 3). Create a makeshift kitchen in another room of the house. If you have a dining room, set up a microwave, toaster, coffeemaker and other small appliances you use regularly so that you can make at least basic meals and snacks during your remodeling.

    • 4). Prepare your grill for outdoor cooking. Purchase a full gas tank for gas grills, or stock up on charcoal. Expect to cook many of your meals outside during the remodeling.

    • 5). Stock up on paper plates, cups and utensils. During the project, you may have limited use of the sink and dishwasher, and using disposable products will prevent you from having to wash dishes in the bathtub or bathroom sink.

    • 6). Save discount coupons for local restaurants for several weeks leading up to the remodeling. Even with a temporary kitchen, you might find it easier to eat out or get takeout more often than usual. Using coupons can help save you some cash.

    • 7). Protect your flooring, if it is not being replaced in the remodeling. The contractor may do this for you, but if not, purchase some carpet remnants from a local carpet store and tape them down to the floor to prevent damage while the contractors work on your kitchen.

    • 8). Adjust your expectations. Understand that your life is going to be disrupted for several days, weeks or even months during the remodeling, and things may go wrong or take longer than expected. Be flexible, and remember that at the end of the chaos and disruption, you'll have the new kitchen of your dreams.