Go to GoReading for breaking news, videos, and the latest top stories in world news, business, politics, health and pop culture.

How to Compact Fill Dirt for Building

104 12
    • 1). Dampen the surface of the fill dirt you wish to compact. Don't over saturate it to the point where pools of water form or it becomes muddy. The surface should have a uniform dark color, and wind should not be able to raise a cloud of dust from the area.

    • 2). Set up string line 8 inches above the grade you want your dirt to be at. Make sure the string is level. Place it every 8 feet so you can see how uniformly level the surface of your fill dirt is. Fill in any obvious low points with a few shovels of extra fill. When satisfied, take the string line down.

    • 3). Tamp the soil, using a hand tamp or machine tamp, working back and forth in a grid pattern. Tamp the fill dirt for at least 20 minutes. Then put the string line back up and eyeball the fill dirt to make sure it is still level. Add more dirt if needed and tamp again.

    • 4). Test the soil with the compaction-testing machine. Contact your local zoning board to learn what range of results is acceptable for fill dirt on your site. If you fail the compaction test, dampen the earth again, re-tamp and re-test.

Source...

Leave A Reply

Your email address will not be published.